Projects
Streets paved in El Mahmoudiya, Sidi Gaber, Bakos and Gleem
East District’s share of the roads directorate’s plan to pave 40 streets and sites in two weeks, with interlock paving outside El Andalusia Hospital.
What’s new
3 stories · Projects
Projects
East District’s share of the roads directorate’s plan to pave 40 streets and sites in two weeks, with interlock paving outside El Andalusia Hospital.
Projects
The governor announced that the roads directorate had finished repairing and upgrading the bridge, and had begun work on the slow lane of El Mahmoudiya Road outside Ezbet Hegazy.
Projects
Progress on paving and lighting in 2025/2026 and the outline of the 2026/2027 plan, with a focus on the rural hinterland.