East District ran a campaign in phase two of removal wave 28 that removed 15 unlawful structures: 14 hangars and walls caught early, and the fifth upper floor of a building, over 3,545 square metres in all.
The removals were in Ezbet Ganayoti, Abis 2, 6 October, Ezbet Abdel Hamid, Timour Street and Ezbet El Messiri. Eng. Engy Mohamed Fathy, head of East District, said the removal of unlawful structures and illegal building will continue.
Sources
- Ahram Gate (opens in a new tab)
An original summary of a dated press report; see the source for details.
